Callaway Elementary School

This architectural project that Sarah participated in with Kendrick David Dowling (1999) focused on the expansion of an existing elementary school through the addition of two wings specifically designed to accommodate pre-K and early elementary students. The new construction of 16,600 SF provided classroom space and dedicated restroom facilities, all while adhering to stringent educational standards and durability requirements in a hurricane-prone region. Construction was concrete block and brick, with steel framing and metal roofs.